Total Height Safety

PROJECTS

  1. Home
  2. >>
  3. Projects
  4. >>
  5. Cawthorn Aquaculture
January 18, 2024

Cawthorn Aquaculture

Project Overview

Cawthorn Aquaculture runs a biosecurity plant that researches the harmful effects of pests and diseases on the environment. Located in Nelson they have large ponds where they harvest fish and plant life for science. Total Height Safety was engaged to place lifelines around the perimeter of the ponds to provide safe access to these ponds without the risk of falling into the water.

Client

Cawthron Institute

Location

Nelson

Category

Infrastructure & Industrial

Solution

Two horizontal lifelines were installed around the Cawthorn Aquaculture research facility to keep the workers from falling into the water. The horizontal lifelines were installed into engineered posts. Once the posts were in, installation of the lines took two hours.

Specs

  • 1 day
  • 148 metres of lifeline (2 Lines)