Solution

The CourierPost and Freightways Warehouses at Christchurch International Airport consists of two large buildings. Across both, we installed 1171 metres of horizontal lifeline, 44 anchor points and 9 permanent access ladders with walk off platforms.

Details

Installation took two men two weeks to complete. This project required us to revisit our health and safety policy and work to the comprehensive management plan required by the airport. By doing this, we were able to score 100% on Sitewise and win the job through a tender process with Fletcher Construction Ltd.

We revisited the client a year later to install plant platforms and handrails with access walkways and stairs.

Specs

  • 10 days
  • 1171 metres of lifeline (17 Lines)
  • 9 permanent ladders and walk off ladders
  • 44 anchor points